For laser cutting estimators / CZ · SK

Do more than calculate. Explain the price.

Cut length alone does not determine a job price. Separate time, pierces, material and preparation. KOVOSYS connects the inputs; the correct specification and commercial decision remain your responsibility.

Quotation preparation. Not laser machine control.

LAYOUT STUDY / 2DILLUSTRATION
SHEET / WORKSPACESHAPE · GAP · ORIENTATION A / 01A / 02C / 01B / 01B / 02B / 03 REMNANT?CHECK
Schematic illustration, not a job output. Gaps, dimensions and remnant usability are not manufacturing recommendations.

01 / INPUTSDrawing, material, thickness, quantity.

02 / CONTEXTGeometry, layout and cost inputs.

03 / DECISIONCheck. Explain. Quote.

Define what the estimate actually covers

Laser cutting cost estimation starts by defining the delivery. Are you pricing individual blanks or a finished assembly after additional operations? Does your company supply the sheet, or does the customer? Are deburring, marking, packaging and transport included? Without those decisions, a correct cutting calculation may cover only part of the real cost. Meanwhile the customer may interpret the total as covering everything mentioned in the inquiry.

KOVOSYS provides a technical estimate based on geometry, material parameters and configured rates. An inquiry with parts and attachments forms the working basis. This guide explains relationships between those inputs, not a universal price list for cutting services. Adapt the method to equipment, required quality and business rules. A rate field in a form does not establish that the entered value has been technologically validated.

Divide information into confirmed customer requirements, internal technological assumptions and commercial terms. Thickness may be confirmed by a drawing, pierce time taken from a checked company source and quotation validity set by sales. This separation lets you amend one component without silently changing the meaning of another. It also explains whether a changed total came from scope, rates or a commercial choice.

Check the drawing before checking the money

Review valid revision, units, scale, material, thickness and quantities. Then compare detected parts with what the customer actually orders. An inner hole is not a separate item for sale, and repeated geometry is not necessarily the requested copy count. Check whether the file includes an earlier layout, reference markings or another product variant. A simple sum of entities may not represent the delivery scope.

A basic dimensional check often reveals a larger issue than later price adjustments. Verify a known dimension, overall part size, an important functional hole and contour closure. Current spline processing derives length from segments between control points, not generally the exact curve length. Compare complex geometry independently. A smooth preview and a believable total do not eliminate that limitation.

If the result differs from experience, do not immediately change the hourly rate. Determine whether the parser is evaluating the geometry you intended. Duplicate lines can inflate length; a missed hole can reduce it. Lead-ins and engraving definitions can also explain differences. Tune pricing only after establishing that the right thing is being measured, otherwise one job's hidden error becomes a misleading coefficient applied to subsequent work.

Units decide what the number means

The time-per-length input must be unambiguous. With seconds per millimetre, multiply length in millimetres by that value. With millimetres per second, the input is speed and time is obtained by division. Copying a number without conversion can create a radically different result. The same care applies when moving between metres per minute and millimetres per second, even if the unit label occupies little space on a form.

For a mathematical illustration, 2,400 millimetres per minute equals 40 millimetres per second, or 0.025 seconds per millimetre. This is a unit conversion, not a recommended cutting speed. Check seconds per start for pierces and currency per hour for the hourly rate. If the calculated time is in seconds, divide by 3,600 before multiplying by a rate expressed per hour.

Material units need equal care. A kilogram price is multiplied by mass, not directly by area. Square millimetres combined with kilograms per square metre require a conversion by one million. If areal mass is already expressed per square millimetre, that conversion is embedded in the value. Include units explicitly in reviews; an isolated number cannot safely be moved between a spreadsheet, a technical document and an application field.

Keep cutting time and pierces separate

The basic model is length multiplied by time per millimetre, plus pierce count multiplied by time per pierce. The components represent different physical events. One long continuous path and the same total length divided among many small holes need not take the same production time. Neither total length nor net part area alone is a sufficient pricing basis. Starts deserve their own checked input.

In the current calculation basis, priced length also includes engraving and lead-ins, while pierce count relates to cutting. This definition matters when comparing another system. A report including lead-ins cannot be directly compared with one counting only principal contours and then declared wrong. Align the definitions first and inspect how each type of geometry contributes to the sum.

This simplified model is not a full machine simulation. Travel, acceleration on short segments, technological pauses and handling can affect real duration. A time allowance may cover defined differences but does not prove each effect was individually modelled. Validate it against suitable known jobs and record what it is intended to include. That keeps the estimate interpretable rather than presenting it as a guaranteed machine cycle time.

A worked illustration, not a machine recommendation

The following figures are strictly illustrative: total included length 18,420 millimetres, 76 pierces, 0.024 seconds per millimetre and 0.65 seconds per pierce. Use an hourly rate of CZK 2,850, a 12% time allowance and a one-off preparation charge of CZK 240. These are not a manufacturing quotation, verified process settings or recommendations for a particular laser, material or quality requirement.

Cutting contributes 18,420 × 0.024 = 442.08 seconds. Piercing adds 76 × 0.65 = 49.40 seconds. The total is 491.48 seconds; multiplying by 1.12 gives 550.4576 seconds. Divide by 3,600 and multiply by the illustrative hourly rate to obtain CZK 435.78 after rounding. This is the time component, not the whole job price or the price of one ordered copy.

Assume a charged rectangle of 1,200 × 800 millimetres, areal mass 23.55 kilograms per square metre and material price CZK 42 per kilogram. The area is 0.96 square metres and mass 22.608 kilograms, giving CZK 949.54 for material. Adding the rounded time component and preparation gives CZK 1,625.32. This excludes separate margin, tax and additional operations. The chosen area does not prove that any particular parts actually fit the rectangle.

Use a consistent rounding rule. Adding already rounded components can differ slightly from rounding only the final total. Keep more precise intermediate values during an independent check and record where rounding occurs. A minor currency rounding discrepancy has a different cause from missing material or an incorrect copy count. Do not attempt to solve all discrepancies through the same rate adjustment.

Which material area does the customer pay for?

Material price cannot be determined until the charged area is defined. Net blank area, the occupied bounding rectangle of a layout and an entire purchased sheet are different quantities. Each can answer a useful question, but they are not interchangeable. Decide whether the company charges a used strip, a whole sheet or another supported basis. Apply the same rule when comparing variants so that an apparent improvement is not merely a changed denominator.

Check the dimensions of the charged rectangle used in the calculation. They do not automatically identify a warehouse sheet format. If area is taken from a layout, verify every required copy and the result's suitability. If a layout is unavailable or still needs review, do not confirm material merely because the total looks reasonable. Missing parts can reduce area and price without producing an obviously absurd amount.

Separate a remnant's theoretical area from its real usefulness. Narrow gaps between parts rarely become another straightforward job. A continuous leftover can have value if its grade, thickness, dimensions and surface restrictions are known and it can physically be found. Crediting that value to the customer is a supported business decision. Do not assume a completed automatic remnant inventory feature makes the decision on your behalf.

Preparation is not the same as beam-on time

Preparation may include checking files, processing documents, setting up the work and other activities before cutting. Its charging method should reflect company practice. A one-off amount per job behaves differently from time allocated to every copy. When comparing unit prices, state whether preparation has been distributed across quantity or remains separate. Otherwise a short run can look disproportionately expensive without an understandable explanation.

Imagine six copies and sixty copies of the same part. If preparation is unchanged, its share per copy differs. That does not mean every other cost grows linearly: placement, required sheet count and handling can also change. Recalculate the relevant basis for a new quantity instead of multiplying the last known unit price. A batch-size change is not just a different label beside the same estimate.

Also distinguish a time allowance from a monetary preparation charge. An allowance multiplies calculated time; a fixed fee is added in currency. Without clear definitions, the same activities can be charged twice. Write down what each component covers. That explanation assists quotation review and later comparison with actual effort, especially when the discrepancy comes from handling rather than the cutting path itself.

Calibrate parameters without concealing input errors

Compare the model with real known jobs of similar material and thickness. Include long contours, small holes and shapes containing many short segments. One universal value may fit some cases and underestimate others. Before changing it, confirm correct evaluated length and pierce count. A technological rate cannot be established reliably from a case whose true geometry scope is unknown.

If cutting time is sensible but handling makes the job longer, slowing every line in the model is not automatically the right response. Frequent pierces should not necessarily be hidden in a general setup fee. Find the cause and assign it to the appropriate component. The aim is not to force one total to match, but to retain meaningful parameters for a different mix of lengths, holes and quantities.

Assess each change on several examples and retain the original evidence. Record date, reason and intended range of use. If the evidence is insufficient, acknowledge uncertainty rather than claiming validated performance. KOVOSYS supplies a place where parameters affect cost, not proof of their truth. Your own checked data is more useful than another workshop's price list detached from its machine, required quality and production conditions.

A unit estimate and a job total can have different bases

A per-part estimate helps understand relative effort, but adding those estimates may not equal the cost of the whole sheet. Layout gaps, shared preparation and the material charging rule belong to the job as a whole. Copying analytical part figures straight into a customer offer can omit part of the cost basis. Decide which amount is the binding total and which figures are an internal allocation.

Two bracket types may have similar net areas yet leave irregular space when placed together. Allocating material by net area is one possible internal rule, not a universal physical truth. Another business may use envelopes or quote the delivery as a single package. Keep the allocation consistent and ensure its sum agrees with the intended commercial total. Do not describe an accounting convention as a measured manufacturing saving.

When quantity changes, check both the cutting multiplier and the new charged area and preparation allocation. Compare repeated parts on matching units. Price per set, price per part and price for the full delivery must not alternate without explanation. Always review amount alongside quantity and unit. Clear wording often prevents a larger commercial mistake than an additional decimal place in the calculation.

Recalculate the consequences of a changed requirement

Changing thickness is not merely editing descriptive text. It changes areal mass, can require different time parameters and has technological consequences. A material change affects more than kilogram price; cutting behaviour and surface handling can change too. A new quantity affects total length, pierces and nesting. Review all dependencies instead of treating an old visible result as still valid.

A saved pricing snapshot preserves the rates and related parameters used for a calculation. It helps distinguish a former basis from a recalculated one, but is not a complete history of all working quotation versions or a promise to restore any earlier state. If your approval process requires such history, verify available records before adoption and define how accepted evidence will be retained.

Before issue, ensure the customer document uses the current saved calculation. A draft created before a material or quantity change must not be issued as though nothing happened. Explain substantial revisions so the customer can tell whether the cause is a rate change, drawing amendment or different quantity. An explainable price change is part of a dependable process, just like an explainable initial estimate.

From technical estimate to an approved selling quotation

An internal calculation records technical and cost assumptions. A selling quotation is a customer-facing document requiring additional decisions: who offers what to whom, in which currency and under which terms. Do not confuse margin with a time allowance. They serve different purposes even when both influence the final amount. Define them separately and check that requested downstream operations have not vanished between the inquiry and the offer.

KOVOSYS supports drafting and issuing customer quotations linked to a saved calculation. Actual business information must still be completed and read before issue. Review scope, quantities, price, currency, tax, validity and conditions. Check that internal hourly rates or unrelated data are not exposed. Automatic filling is not approval. Issuing is also not the same as customer acceptance or proof that the document was delivered.

For the final check, work in order: specification, geometry, quantities, units, appropriate material parameters, time, area and total. Mark unresolved points as conditions rather than disguising them with a price to two decimals. Check preparation for double counting and material for a consistent basis. A quotation, production approval and machine program remain different outputs; KOVOSYS does not turn the estimate into an instruction to start cutting.

Before your first calculation.

Is a price per metre of cut enough?

No. You need verified geometry, quantities, material and thickness, pierce definitions, time parameters, time pricing and a material charging rule. Assess preparation and other requested operations separately.

Can I use the example settings on my laser?

The example explains arithmetic only. It is not a quotation or technological recommendation. Validate parameters for your machine, material, thickness and quality requirement.

Why can individual estimates differ from the job total?

The whole job can include charged layout area and shared preparation that are not simply the sum of individual net part areas. Check the allocation method and commercial basis.

Can I start cutting directly from a calculation?

No. A calculation and layout preview are not an approved machine program. Separate technological preparation and checking in the designated control environment are required.

A sound price starts with a traceable process.